ANALISIS ANGGARAN BIAYA DAN REALISASI BIAYA PROYEK PEMBANGUNAN GEDUNG ASRAMA PUTRI DI YAYASAN DHARMA LAKSANA KOTA MATARAM

I WAYAN GRYA DHANENDRA, BAGUS WIDHI DHARMA S., I GUSTI NGURAH OCTAVA S.

Abstract


This study aims to analyze the budget and realization of project costs for the construction of a female dormitory building at the Dharma Laksana Foundation, Mataram City. The method in this study uses a type of comparative descriptive method with a quantitative approach. The type of data used is quantitative data, the data sources used are primary data and secondary data.

The total budget for the construction of the girls' dormitory building at the dharma laksana foundation is Rp. 435,130,197, and when the construction was carried out there were material changes which caused a difference in the budget of Rp. 512,726 where this difference was a profit, but there was some additional work outside the construction of this girls' dormitory building where the extra budget was included in additional work

Keywords


Audgeted costs, realized costs.

Full Text:

PDF

References


Hadinata, G. W., Nadiasa, M., & Widhiawati, I. A. (2013). Analisis Faktor Faktor Penyebab Pembengakakan Realisasi Biaya Terhadap Rencana Anggaran Pelaksanaan Pada Proyek Konstruksi Gedung. Jurnal Ilmiah Elektronik Infrastruktur Teknik Sipil, 2.

Nafarin. (2013). Penganggaran Perusahaan. Jakarta: Selemba empat.

Pratiwi, T. W., Putri, Y. E., & Indriyani, R. (2014). Analisis Persediaan Material Pada Proyek Pembangubab Jembatan Sungai Brantas di Ruas Tol Kertosono-Mojokerto. Jurnal Teknik Pomits, 3.

Rahman. (2013). Perbandingan Estimasi Anggaran Biaya Metode SNI dan Metode BOW pada Proyek Pembangunan Gedung Joang.

Rifqiwanto. (2015). Akuntansi dan Manajemen: sistem proses dan pemecahan soal. Jakarta: Bumi Aksara.

Sarah C.G Lengkong, Harijanto Sabijono, & Victorina Z.Tirayoh. (2021, Juli). Analisis perencanaan dan pengendalian biaya proyek pada PT. Marga Dwitaguna. Jurnal EMBA, Vol. 9 No.3, 1069-1076.

Siti Khoerunisa, A. D. (2022). Analisis Rencana Anggaran Biaya Proyek dan Realisasi Anggaran Proyek Terhadap Profitabilitas PT.Bima Sakti Geotama Bandung. Jurnal Ilmiah Manajemen, 3.




DOI: https://doi.org/10.35327/sosintek.v3i2.601

Refbacks

  • There are currently no refbacks.


Copyright (c) 2023 SOSIAL SAINS DAN TEKNOLOGI

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

jambislot

https://similarplay.com/

sakti55

 

________________

Indexing

 

 

 


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

_______________________________

Sosial Sains dan Teknologi

Published by UNMAS Denpasar K. Mataram |
Email: sosintek 2020@gmail com; aminullahmtk@gmail.com

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.http://ujian.bebras.polinema.ac.id/images/demo/

slot dana