ANALISIS RISIKO PADA PELAKSANAAN PROYEK PEMBANGUNAN SARANA PENGENDALIAN BANJIR PADA WADUK MUARA NUSA DUA DENPASAR

ANAK AGUNG RATU RITAKA WANGSA, TJOKORDA ISTRI PRAGANINGRUM, I GUSTI AGUNG AYU ISTRI LESTARI, IDA BAGUS SURYATMAJA

Abstract


Flooding that occurs due to runoff and scouring of Nusa Dua estuary reservoir water in Denpasar city causes the risk of inundating the surrounding roads and entering the mangrove forest. One of the efforts made by the Bali-Penida River Basin Hall is to carry out a flood control facility construction project. The purpose of this study is to identify the risks faced, measure and determine the magnitude of acceptable risks. The method used is descriptive with a qualitative approach. Data collection was conducted by interviews related to risk identification and questionnaires related to risk assessment. The results showed that the risks identified in the implementation of the flood control facility development project in the Nusa Dua estuary reservoir amounted to 36 risks consisting of 10 risk sources. The dominant source of risk is technical, project and safety risks with a percentage of 14%. After an assessment by 17 respondents, there were 15 risks (86%) with unacceptable categories, 10 risks (63%) with undesirable categories, 7 risks (38%) with acceptable categories, and 4 risks (13%) with negligible categories.

Keywords


Construction of Facilities, Estuary Reservoir, Flood Control, Risk

Full Text:

PDF

References


Darmawi, H. (2016). Manajemen Risiko Edisi 2 (Suryani (ed.); 2nd ed.). Bumi Aksara.

Estri Kartika, Endang Purnawati Rahayu, Kamali Zaman, Herniwanti, & Nopriadi. (2022). Analisis Manajemen Risiko dengan Metode AS/NZS 4360:2004 pada Tangki Timbun Minyak di Riau. Afiasi : Jurnal Kesehatan Masyarakat, 7(1), 218–226. https://doi.org/10.31943/afiasi.v7i1.193

Hawari, K. (2009). Identifikasi Risiko Proyek Pada Tahap Konstruksi Bangunan Bertingkat 4-20 Lantai Di Jabotabek Dari Sudut Pandang Kontraktor. 1, 1–129.

Imansari, A., Harimurti, & Indradi, W. (2017). Analisis Risiko Berdasarkan Aspek Waktu dengan Metode Monte Carlo Pada Proyek Gedung Baru di Universitas Brawijaya. Brawijaya.

Mega Astiti, N. P., Norken, I. N., & Purbawijaya, I. (2015). Analisis Risiko Pelaksanaan Pembangunan Jalan Tol Benoa – Bandara – Nusa Dua. Jurnal Spektran, 3(2), 84–89. https://doi.org/10.24843/spektran.2015.v03.i02.p010

Nempung, T., Setiyaningsih, T., & Syamsiah, N. (2015). Otomatisasi Metode Penelitian Skala Likert Berbasis Web. November, 1–8.

Pagehgiri, J., Putra, I. K. A. A., & Dwipayana, I. W. M. (2021). Identifikasi Penilaian Dan Mitigasi Risiko Pada Proyek Villa Nini Elly. Jurnal Teknik Gradien, 13(1), 61–73. https://doi.org/10.47329/teknikgradien.v13i1.742

Permen PUPR, I. (2015). Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Republik Indonesia Nomor 28/PRT/M/2015 Tentang Penetapan Garis Sempadan Sungai dan Garis Sempadan Danau. In Indonesia, Kementerian Pekerjaan Umum dan Perumahan Rakyat.

Rumimper, R. R. (2015). Analisis Resiko Pada Proyek Konstruksi Perumahan Di Kabupaten Minahasa Utara. Jurnal Ilmiah Media Engineering, 5(2), 381–389.

Sari, M., Rachman, H., Astuti, N. J., Afgani, M. W., & Abdullah, R. (2023). Explanatory Survey dalam Metode Penelitian Deskriptif Kuantitatif Jurnal Pendidikan Sains dan Komputer. Jurnal Pendidikan Sains Dan Komputer, 3(1), 10–16.

Sugiono 2016 dalam Fakhri. (2021). Metode Penelitian Purposive Sampling. 2021, 32–41.

Tjakra, J., & Sangari, F. (2011). Analisis Resiko Pada Proyek Konstruksi Perumahan Di Kota Manado. Jurnal Ilmiah Media Engineering, 1(1), 29–37.

Wena, M., & Suparno. (2015). Manajemen Risiko Dalam Proyek Konstruksi. Jurnal SMARTek, 9(1), 39–46.




DOI: https://doi.org/10.35327/gara.v17i4.656

Refbacks

  • There are currently no refbacks.


Copyright (c) 2023 GANEC SWARA

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

https://similarplay.com/