|
Issue |
Title |
|
Vol 15, No 1 (2021): Maret 2021 |
EKSEKUSI PUTUSAN PENGADILAN TATA USAHA NEGARA TERHADAP PEJABAT PEMERINTAH DAERAH BERDASARKAN UNDANG-UNDANG NOMOR 9 TAHUN 2004 |
Abstract
PDF
|
ABDUL TAYIB |
|
Vol 15, No 2 (2021): September 2021 |
EKSISTENSI DEMOKRASI DAN KORUPSI BIROKRASI PELAYANAN PUBLIK DI INDONSIA |
Abstract
PDF
|
H. ISMAIL MZ |
|
Vol 17, No 3 (2023): September 2023 |
EKSPLORASI TANAMAN YANG BERPOTENSI SEBAGAI SUMBER BAHAN BAKAR NABATI DI BUKIT JIMBARAN, BALI |
Abstract
PDF
|
RAMDHOANI RAMDHOANI, COKORDA JAVANDIRA |
|
Vol 17, No 2 (2023): Juni 2023 |
ENGLISH LEARNING STRATEGIES USED BY THE STUDENTS IN ENGLISH EDUCATION DEPARTMENT IN SOLVING THEIR LEARNING DIFFICULTIES |
Abstract
PDF
|
ELLI MARLIANA, MARLISA MARLISA |
|
Vol 15, No 1 (2021): Maret 2021 |
ENHANCE VOCABULARY SKILL THROUGH READING REPETITION (REPEATED READING) |
Abstract
PDF
|
I GUSTI NGURAH OCTOVA SEVENTILOFA |
|
Vol 15, No 2 (2021): September 2021 |
ERROR ANALYSIS ON INDONESIAN YOUTUBE VIDEOS |
Abstract
PDF
|
I GUSTI NGURAH OCTOVA SEVENTILOFA |
|
Vol 18, No 1 (2024): Maret 2024 |
EVALUASI KEBIJAKAN PENANGGULANGAN STUNTING DI KABUPATEN LOMBOK TIMUR |
Abstract
PDF
|
LALU MUH. KABUL |
|
Vol 16, No 1 (2022): Maret 2022 |
EVALUASI KEWAJARAN SCHEDULE KONTRAKTOR MENGGUNAKAN WORK BREAKDOWN STRUCTURE (WBS) DAN MICROSOFT PROJECT (STUDI PADA PROYEK PEMBANGUNAN SDN 5 SOKONG, TANJUNG, LOMBOK UTARA) |
Abstract
PDF
|
ZAEDAR GAZALBA, I GEDE PUTU WARKA, LALU WIRAHMAN W |
|
Vol 17, No 4 (2023): Desember 2023 |
EVALUASI KINERJA JARINGAN PIPA TRANSMISI MATA AIR PEBINI KECAMATAN KINTAMANI KABUPATEN BANGLI |
Abstract
PDF
|
KETUT SORIARTA, PUTU DODDY HEKA ARDANA, M. ALDI CAHYA |
|
Vol 14, No 1 (2020): Maret 2020 |
EVALUASI KINERJA OPERASIONAL TERMINAL DARA KOTA BIMA |
Abstract
PDF
|
I WAYAN SUTEJA, ROHANI ROHANI, HASYIM HASYIM |
|
Vol 16, No 1 (2022): Maret 2022 |
EVALUASI KINERJA RUAS JALAN DAN SIMPANG TIDAK BERSINYAL DENGAN FASILITAS PUTAR BALIK (U-TURN) STUDI KASUS JALAN SRIWIJAYA DI KOTA MATARAM |
Abstract
PDF
|
ROHANI ROHANI, HASYIM HASYIM, MUHAMAD DILAN HIDAYTULLAH |
|
Vol 18, No 1 (2024): Maret 2024 |
EVALUASI KINERJA SIMPANG BERSINYAL SEBELUM DAN SESUDAH PEMASANGAN INTELLIGENT TRAFFIC CONTROL SYSTEM (ITCS) (STUDI KASUS: SIMPANG BERSINYAL DASAN CERMEN KOTA MATARAM) |
Abstract
PDF
|
HASYIM HASYIM, ROHANI ROHANI, MAYA MASITA |
|
Vol 17, No 3 (2023): September 2023 |
EVALUASI KINERJA SIMPANG TAK BERSINYAL TIPE 422 DAN TIPE 424M (STUDI KASUS : SIMPANG EMPAT TAK BERSINYAL JALAN TGH IBRAHIM KHOLIDI, KECAMATAN KEDIRI, KABUPATEN LOMBOK BARAT) |
Abstract
PDF
|
HASYIM HASYIM, ROHANI ROHANI |
|
Vol 17, No 4 (2023): Desember 2023 |
EVALUASI KUALITAS PELAYANAN PRIMA CARGO HANDLING TERHADAP KEPUASAN PELANGGAN PADA PT. GAPURA ANGKASA CABANG DENPASAR |
Abstract
PDF
|
SHANIA AULIA RACHMA, KASIANI KASIANI, AA. AYU MIRAH KENCANAWATI, COKORDA GEDE PUTRA YUDISTIRA, LILY MARHENI, I MADE SARJANA |
|
Vol 17, No 2 (2023): Juni 2023 |
EVALUASI PELAKSANAAN PENYEDIAAN INFRASTRUKTUR PERMUKIMAN PADA PROGRAM KOTAKU DI KELURAHAN PANCOR KABUPATEN LOMBOK TIMUR |
Abstract
PDF
|
NOVIA ARIANA, I DEWA MADE ALIT KARYAWAN |
|
Vol 17, No 3 (2023): September 2023 |
EVALUASI PENERIMAAN SISTEM TNDE MENGGUNAKAN METODE TAM PADA PT ANGKASA PURA I BALI |
Abstract
PDF
|
ANAK AGUNG ISTRI WULAN PRAMIYANTI, I GUSTI LANANG SUTA ARTATANAYA, I MADE WIDIANTARA, COKORDA ISTRI SRI WIDHARI |
|
Vol 17, No 3 (2023): September 2023 |
EVALUASI POTENSI RISIKO KESELAMATAN DAN KESEHATAN KERJA (K3) PADA PROYEK PEMBANGUNAN PLTMGU LOMBOK (PEAKER) 130 – 150 MEGAWATT DENGAN METODE JOB SAFETY ANALYSIS (JSA) |
Abstract
PDF
|
LALU WIRAHMAN WIRADARMAN, TETI HANDAYANI, ZAEDAR GAZALBA, I WAYAN SUTEJA |
|
Vol 16, No 2 (2022): September 2022 |
EVALUASI PRODUKTIVITAS DAN EFISIENSI ALAT BERAT PADA PEKERJAAN TANAH PROYEK PERPANJANGAN RUNWAY DI BANDARA INTERNASIONAL LOMBOK |
Abstract
PDF
|
AMRUN ZAOQI, HASYIM HASYIM, I GEDE PUTU WARKA |
|
Vol 15, No 1 (2021): Maret 2021 |
EVALUASI PROGRAM PEMBERDAYAAN PEREMPUAN MELALUI PELATIHAN MENJAHIT DI SANGGAR KEGIATAN BELAJAR (SKB) UJUNG PANDANG |
Abstract
PDF
|
NINI PRATIWI, ILHAM SUPIANA |
|
Vol 17, No 4 (2023): Desember 2023 |
EVALUASI TUNDAAN PADA SIMPANG EMPAT TAK BERSINYAL DI KOTA MATARAM (STUDI KASUS : SIMPANG JALAN PEJANGGIK DAN SIMPANG JALAN CATURWARGA) |
Abstract
PDF
|
HASYIM HASYIM, ROHANI ROHANI |
|
Vol 13, No 2 (2019): September 2019 |
FAKTOR INFRASTRUKTUR DALAM PEMBANGUNAN EKONOMI KOTA MATARAM |
Abstract
PDF
|
SANTIAN SANTIAN, PUTU KARISMAWAN, BAIQ SARIPTA W.M |
|
Vol 17, No 3 (2023): September 2023 |
FAKTOR FAKTOR YANG MEMPENGARUHI BELANJA MODAL DI PEMERINTAH KABUPATEN TABANAN |
Abstract
PDF
|
I MADE HARY KUSMAWAN, SUHARWAN HAMZAH, I GEDE ANGGA PERMANA |
|
Vol 16, No 2 (2022): September 2022 |
FAKTOR PENYEBAB DAN UPAYA PENYELESAIAN KASUS PERTANAHAN DI DESA BILELANDO KECAMATAN PRAYA TIMUR KABUPATEN LOMBOK TENGAH |
Abstract
PDF
|
NOVIE AFIF MAULUDIN |
|
Vol 12, No 1 (2018): Maret 2018 |
FAKTOR PENYEBAB WANPRESTASI PELAKSANAAN PERJANJIAN SEWA BELI SEPEDA MOTOR DI PT. ADIRA FINANCE MATARAM |
Abstract
PDF
|
TITIN APRIANI, NI LUH ARININGSIH SARI, I NYOMAN JAYA ARTANA |
|
Vol 15, No 1 (2021): Maret 2021 |
FAKTOR-FAKTOR YANG MEMPEGARUHI PENDAPATAN PEDAGANG DI PASAR GULINGAN KECAMATAN MENGWI KABUPATEN BADUNG |
Abstract
PDF
|
I GUSTI AYU LIA YASMITA |
|
176 - 200 of 602 Items |
<< < 3 4 5 6 7 8 9 10 11 12 > >> |