KAJIAN FAKTOR PENYEBAB KENDALA IMPLEMENTASI KONSEP GREEN CONSTRUCTION PADA GEDUNG PASAR GIANYAR

NI LUH MADE AYU MIRAYANI PRADNYADARI, TJOKORDA ISTRI PRAGANINGRUM

Abstract


Ongoing construction projects using material resources and equipment can harm environmental conditions. Thus, it requires high awareness and willingness to maintain the environment in construction project management. Green construction is explained as an effort or strategy for managing construction activities, including the use of resources that are efficient and environmentally friendly so that they can support a sustainable movement. This research aims to discover the causes of obstacles in implementing green construction in the Gianyar Market development project. The method used is qualitative, with interviews with 28 respondents involved in the construction process of the Gianyar Market development. From the results of the study, it was found that the constraints experienced by contractors in the implementation of Greem construction included (1) Human Resources, (2) Materials or Material Resources, (3) Facilities and Infrastructure, and (4) Costs. These constraints are caused by several factors, namely (1) Lack of understanding, (2) Requiring particular experts, (3) Need to improve the quality of facilities and infrastructure, and (4) Readiness of the budget. From these results, it is possible to evaluate and increase the quantity and quality of the facilities and infrastructure owned to support the implementation of green construction, as well as coordinate with Experts who understand green construction well.

Keywords


Green construction, Causes, Constraints, The Gianyar Market

Full Text:

PDF

References


Council, U.S.G.B. (2009). Green Building Design and Construction For the Design , Construction.

Green Building Council Indonesia. 2010. GREENSHIP New Building Version 1.2.

Indonesia, B.P.K.R. (2021). November. Pasar Rakyat Termegah di Indonesia Diresmikan di Gianyar.

Kubba, S. (2010). Green Construction Project Management and Cost Oversight. United States of America: Elsevier.

Sari, A.N., Suryan, V. (2021). Pandemi Covid-19: Dampak Terhadap Pekerjaan Konstruksi. Jurnal Talenta Sipil, 4(2): 214.

Sutrisno, A., Han, G.C. (2009). Studi mengenai dampak lingkungan selama tahap pelaksanaan konstruksi gedung bertingkat. Petra Christian University.

Triyawan, A., Fendayanti, Z.E.U. (2021). Dampak Pandemi Covid-19 Terhadap Keberlangsungan Perusahaan Jasa Konstruksi. Forum Ekonomi, 23(2): 223–230.

Utama, R.P.A., Saraswati, Sawitri, N.N.I., Praganingrum, IstriTjokorda, Pradnyadari, Ayu, M.N.L.M., Suryatmaja, Ida, B., Suryadarmawan, Agung, G.I.G. (2023). Analisis Pemahaman Konsep Green Construction Pada Pembangunan Gedung Konstruksi. Jurnal Ganec Swara, 17(1): 208–212




DOI: https://doi.org/10.35327/gara.v17i2.469

Refbacks

  • There are currently no refbacks.


Copyright (c) 2023 GANEC SWARA

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

TERINDEKS

 

 

 

 

 

 

 


_______________________________

Ganec Swara

Published by UNMAS Denpasar K. Mataram |
Email: ganecswara@gmail com; aminullahmtk@gmail.com

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

    
Stat Pengunjung GARA