ANALISIS PERCEPATAN WAKTU PELAKSANAAN PROYEK BERBASIS MICROSOFT PROJECT (STUDI KASUS: PEMBANGUNAN RENOVASI HOTEL LAGUNA RESORT AND SPA NUSA DUA)

I GEDE NGURAH SUNATHA, TJOKORDA ISTRI PRAGANINGRUM, I PUTU SAI CANDRA PREMA NATA

Abstract


In project construction, problems during the implementation phase are unavoidable, resulting in non-compliance with the previously designed plan. In the case study of the construction of the Laguna Resort and Spa Nusa Dua hotel, based on the author's observations, data from the Planned Time Schedule and Realization Time Schedule found differences in the realization time with the plan, where the realization was delayed. In overcoming the delay, it is necessary to accelerate the completion time by accelerating the implementation time and conducting an analysis regarding how much influence the acceleration of completion time has by utilizing the Microsoft Project program. The data used is a quantitative descriptive method, namely by submitting a request for data to the Contractor. From processing the data and conducting 3 experiments on Microsoft Project, the authors chose the second experiment, namely by accelerating the Millwork sub-bill by reducing the average work duration of 1 working day. Activities that experience acceleration are as many as 26 work items including 8 work items on the 1st floor, 6 items on the 2nd floor, 6 items on the 3rd floor, and 6 items on the 4th floor. The results of the accelerated time are 5 (days) according to the time plan schedule

Keywords


Delay, Acceleration of Implementation Time, Microsoft Project

Full Text:

PDF

References


Anggraeni, Riska Elisabeth,dkk (2017). Analisis Percepatan Proyek Menggunakan Metode Crashing Dengan Penambahan Tenaga Kerja Dan Shift Kerja (Studi Kasus : Proyek Pembangunan Hotel Grand Keisha, Yogyakarta), Jurnal Matriks Teknik Sipil, Universitas Sebelas Maret, Surakarta

Dannyanti, E. (2010). Optimalisasi pelaksanaan proyek dengan metode PERT dan CPM. Semarang. Universitas Diponegoro.

Dipohusodo, Istimawan.(1996). Manajemen Proyek & Konstruksi.Kanisius. Jogjakarta.

Mora, dkk, (2001), Dynamic Planning and Control Meghodology for Design/Build Fast track Construction Project, Journal of Construction Engeneering and Manajement. ASCE, Volume 127, No 1.




DOI: https://doi.org/10.35327/gara.v17i2.461

Refbacks

  • There are currently no refbacks.


Copyright (c) 2023 GANEC SWARA

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

TERINDEKS

 

 

 

 

 

 

 


_______________________________

Ganec Swara

Published by UNMAS Denpasar K. Mataram |
Email: ganecswara@gmail com; aminullahmtk@gmail.com

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

    
Stat Pengunjung GARA