IDENTIFIKASI DAN ANALISIS RISIKO PERENCANAAN PEMBANGUNAN MALL GRAND OUTLET BALI DI KAWASAN SERANGAN (STUDI KASUS: MALL GRAND OUTLET BALI DI KAWASAN SERANGAN)

I GUSTI AGUNG AYU ISTRI LESTARI, I GEDE ANGGA DIPUTERA, KRISNA KURNIARI, NI KADEK ARI NATALIA, I GUSTI PUTU WAHYU DANA ARSANA

Abstract


In planning the construction of the Bali Grand Outlet Mall in the Serangan Area, of course it will not be separated from the risks that may occur. To know the risks that will arise, risk management is needed. Risk management is carried out to identify risks, analyze risks, so that you can know what risks are considered high risks. In this research stage, quantitative and qualitative methods are used, which present ideal and actual data with the aim of understanding the conditions and situation of the location studied. The data processing process was carried out by making direct observations at the research location, conducting interviews and distributing questionnaires to related parties totaling 39 respondents. The results of the research found that there were 42 (fortytwo) risks identified from 12 predetermined risk sources. The risk identification, research and acceptance stages consist of 25 unacceptable risks, 13 undesirable risks and 4 acceptable risks.


Keywords


Identification; Analysis; Risk; development; mall

Full Text:

PDF

References


Godfrey, P.S. (1996). Control of Risk :A Guide to the Systematic of risk from Contruction. In Ciria

Nomor 978-0-86017-441-7, hal.1-72)

Helza, Z. Z. (2023). Sistem Informasi Manajemen Sumber Daya Manusia Studi di Kantor Perwakilan Bank Indonesia Provinsi Kalimantan Timur. Jurnal Ekonomi, Manajemen, Dan Akuntansi (JEBM), 25(4), 726–733.

Labombang, M. (2011). Manajemen Risiko dalam Proyek Konstruksi. Jurnal SMARTek, 9(1), 39–46.

Norken, I. N., Purbawijaya, I. B. N., & Suputra, I. G. N. O. (2015). Pengantar Analisis Manajemen Risiko Pada Proyek Konstruksi: Vol. Pertama. Universitas Udayana.

Ramadhan, P. M., & Anwar, S. (2022). Analisis Manajemen Konstruksi pada Jembatan Cikeusal. Jurnal Konstruksi Dan Infrastruktur UGJ Cirebon, 10(1), 1–6.

Situmeang, I. V. O. (2020). Strategi Komunikasi Pariwisata: Menciptakan Seminyak Menjadi Top of Mind Tujuan Wisata di Bali. Jurnal SCRIPTURA, 10(1), 43–52.

https://doi.org/http://dx.doi.org/10.974

/scriptura.4.1.1-9

Soputan, G. E. M., Sompie, B. F., & Mandagi, R. J. M. (2014). Manajemen Risiko Kesehatan dan Keselamatan Kerja (K3) (Studi Kasus pada Pembangunan Gedung SMA Eben Haezar). Jurnal Ilmiah Engineering, 4(4), 229–238.

Sugiono, Noerdjanah, & Wahyu, A. (2020). Uji Validitas dan Reliabilitas Alat Ukur SG Posture Evaluation. Jurnal Keterapian Fisik, 5(1), 1–61.

Tagueha, W. P., Mangare, J. B., & Arsjad, T. T. (2018). Manajemen Resiko Keselamatan dan Kesehatan Kerja (K3) pada Proyek Konstruksi (Studi Kasus: Pembangunan Gedung Laboratorium Fakultas Teknik Unsrat). Jurnal Sipil Statik, 6(11), 907–916.

Urbanus, I. N., & Febianti. (2017). Analisis Dampak Perkembangan Pariwisata terhadap Perilaku Konsumtif Masyarakat Wilayah Bali Selatan. Jurnal Kepariwisataan Dan

Hospitalis, 1(2), 118–133.




DOI: https://doi.org/10.35327/gara.v18i4.1126

Refbacks

  • There are currently no refbacks.


Copyright (c) 2024 GANEC SWARA

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

slot gacor

https://similarplay.com/

slot gacor

ftik-iainpalopo.ac.id

slot gacor terpercaya

slot

pg soft