IDENTIFIKASI FAKTOR PENYEBAB VARIATION ORDER TERHADAP BIAYA DAN WAKTU PADA PROYEK LAVAYA NUSA DUA-BALI

IDA BAGUS GEDE INDRAMANIK, PUTU DODDY HEKA ARDANA, I PUTU GDE DHARMA PRAMANA

Abstract


A construction project is a combination of cost, tools, and labor resources where in the process, the project owner works closely with contractors and suppliers to ensure that the project is of the right quality, time, and cost. In the process of implementing a construction project, of course, various problems will be found. One of the problems is Variation Order or less work. This study aims to find the factors that cause itVariation Order and impact Variation Order on project implementation both in terms of cost and implementation time in the Lavaya Nusa Dua-Bali Apartment project. The method used in this research is descriptive quantitative, where the data used in this research is only secondary data. Based on the results of this study it can be seen that 87.5% of all VO that occurs is dominated by construction factors caused by party requests owner. In addition, the impact of VO work also affects costs and time, where the impact of VO on costs causes an additional cost of 1,194% from the initial contract value of IDR 108,569,930,859.70 to IDR 109,866,110,410.02. Furthermore, for the impact on time, which has no impact on the overall project completion time target but has a direct impact on the contractor for the duration of work handover which has been delayed for 38 working days, from the initial duration of 99 working days to 62 working days.


Keywords


Variation Order, Causal Factors, Time, Cost

Full Text:

PDF

References


Corry Lela, J., Manoppo, F. J., Supit, C. J. (2022). Analisis Penyebab Dan Pengaruh Contract Change Order Terhadap Kinerja Kontraktor Pada Proyek Konstruksi Di Kabupaten Minahasa Selatan. Jurnal Ilmiah Media Engineering, 2(1), 21-34. https://ejournal.unsrat.ac.id/v3/index.php/jime/article/view/40773.

Dharmayanti, G. C., Janasuputra, I. B., & Wiryasa, N. M. A. (2021). Analisis Faktor Penyebab Contract Change Order Dan Pengaruhnya Terhadap Kinerja Pelaksanaan Proyek Konstruksi Di Lingkungan Pemerintah Kabupaten Badung. Jurnal Spektran, 9(2), 141. https://doi.org/10.24843/spektran.2021.v09.i02.p06.

Kurniawan, I., & Garside, A. K. (2021). Identifikasi Dan Analisis Sebab Akibat Contract Change Order Terhadap Biaya Dan Waktu Pada Proyek Konstruksi. Seminar Keinsinyuran Program Studi Program Profesi Insinyur, 1(0), 2797–1775. http://research-report.umm.ac.id/index.php/SKPSPPI/article/view/4215.

Mangampa, M. I. S., Latupeirissa, J. E., & Tiyouw, H. C. P. (2022). Analisis Contract Change Order Terhadap Waktu pada Proyek Pembangunan Stasiun Kereta Api Makassar-Pare pare. Paulus Civil Engineering Journal, 4(3), 444–451. https://doi.org/10.52722/pcej.v4i3.520.

Murtopo, A., Nugroho, A., & Budihardjo, M. A. (2022). Kajian Contract Change Order ( CCO ) Pada Proyek Pembangunan Laboratorium Terpadu Universitas Tidar. Journal Rice, 46–52. https://journal.untidar.ac.id/index.php/rice/article/view/335/133.

Palilati, M. P., Hadi, A. K., & Musa, R. (2022). Analisis Faktor-Faktor Penyebab adanya Variation Order pada Proyek Gedung Pendidikan di Provinsi Gorontalo. Jurnal Konstruksi (JK-TIS), 01(06), 30–41. https://pasca-umi.ac.id/index.php/kons/article/view/1108/1257.

Peraturan Presiden Indonesia Nomor 54 Tahun 2010 Tentang Pengadaan Barang/Jasa Pemerintah. http://www.lkpp.go.id/v3/files/attachments/1_AdRQsAeFlVOdLPKMYiDxPzorXXmSrSWj.pdf.

Putra, H. E., & Sulistio, H. (2020). Pengaruh Change Order Terhadap Biaya, Mutu, Dan Waktu Pada Proyek Konstruksi Gedung Bertingkat. JMTS: Jurnal Mitra Teknik Sipil, 3(4), 1349. https://doi.org/10.24912/jmts.v3i4.8233.

Rajanun, I. Lakawa, S. Hawa, Haryono, S. (2022). Faktor-Faktor Yang Mempengaruhi Contract Change Order Pada Pekerjaan Rehabilitasi Jalan Mataiwoi-Abuki. Engineering, Civil Sciej, Journal, 3(1), 9–17. https://jurnal-unsultra.ac.id/index.php/scej/article/view/240/147.

Sarena, M. R. Q. (2020). Analisis Penyebab dan Akibat Variation Order (VO) Terhadap Biaya dan Waktu (Studi Kasus: Collins Boulevard Apartement). (Tugas Akhir yang dipublikasikan, Program Studi S1 Teknik Sipil Fakultas Infrastruktur dan Kewilayahan Institut Teknologi PLN, 2020). http://156.67.221.169/view/creators/Qori_Sarena=3AMuhammad_Rayhan=3A=3A.default.html.

Sudiarsa, M., Dewi, N. K. A. T., & Triadi, I. N. S. (2021). Analisis pekerjaan variation order pada proyek pembangunan gedung menara mandiri. Journal of Applied Mechanical Engineering and Green Technology, 2(3), 102–107. https://doi.org/10.31940/jametech.v2i3.102-107.

Sutra, D., Soekiman, A., & Hidayat, F. (2022). Identifikasi Faktor Penyebab dan Dampak Change Order Pada Pelaksanaan Proyek Bidang Sumber Daya Air. Jurnal Aplikasi Teknik Sipil, 20(3), 291. https://doi.org/10.12962/j2579-891x.v20i3.12533.

Widhiawati, I. A. R., Wiranata, A. A., & Wirawan, I. P. Y. (2017). Faktor-Faktor Penyebab Change Order Pada Proyek Konstruksi Gedung. Jurnal Ilmiah Teknik Sipil a Scientific Journal of Civil Engineering, 1–7. https://ojs.unud.ac.id/index.php/jits/article/view/30361.

Wijaya, I. G. R., Sudiarsa, M., & Setyono, E. Y. (2022). Analisis Faktor Penyebab Dominan Change Order Dan Pengaruhnya Terhadap Pelaksanaan Proyek Konstruksi. (Tugas Akhir yang tidak dipublikasikan, Program Studi D4 Manajemen Proyek Konstruksi Jurusan Teknik Sipil Politeknik Negeri Bali, 2022). http://repository.pnb.ac.id/id/eprint/2394.




DOI: https://doi.org/10.35327/gara.v18i1.728

Refbacks

  • There are currently no refbacks.


Copyright (c) 2024 GANEC SWARA

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

TERINDEKS

 

 

 

 

 

 

 


_______________________________

Ganec Swara

Published by UNMAS Denpasar K. Mataram |
Email: ganecswara@gmail com; aminullahmtk@gmail.com

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

    
Stat Pengunjung GARA