ANALISIS MANAJEMEN RESIKO TERHADAP MUTU BETON HASIL PRODUKSI READYMIX CONCRETE

ZAITIN NILAWATI, I GEDE PUTU WARKA, ISYA ASHARI

Abstract


In business activities faced by a company will not be apart of a risk. Risks that affect quality, for example concrete quality, are one of the influential risks for ready mixed concrete companies. This research was conducted by survey method to employees in concrete laboratories to determine the frequency and effect of risk on the quality of concrete produced in ready mixed concrete which was then analyzed by the Normality Test, Non-parametric Analysis, and AHP (Analytical Hierarchy Process). Concrete quality analysis was also carried out to determine the level of difference in concrete compressive strength in the plan with the compressive strength produced.
     The results showed that there were 8 out of 31 dominant risk factors produced in each work that affected the quality of the concrete produced, among others: dominant risk factors in concrete material testing work (ie the presence of clay in the aggregate of 14.3% and poor aggregate gradation of 9.8%), dominant risk factor for fresh concrete testing work (i.e. an increase in cement water factor of 7.5% and the occurrence of concrete mixture segregation of 6.5%), dominant risk factor in hard concrete testing work (i.e. there is a small cavity in concrete of 12.5% and cracked concrete is produced due to an initial shrinkage of 7.9%), as well as dominant risk factors for structural work and equipment (i.e. lack of maintenance / maintenance of concrete / curring of 27.0 % and location of unclean cast of 14.5%).

Keywords


Ready mixed concrete, Risk for quality, Risk Response

Full Text:

PDF

References


Antoni dan Paul Nugraha. (2004). Teknologi Beton. Andi. Yogyakarta

Asiyanto, 2005. Manajemen Produksi Untuk Jasa Konstruksi. Pradnya Paramita Jakarta.

Darmawi, Herman. 2004. Manajemen risiko. Bumi Aksara. Jakarta

Murdock dan Brook. 1999. Bahan dan Praktek Beton. Erlangga Jakarta

Maharani, Galuh. R. 2011. Manajemen Risiko Biaya dan Waktu pada Pekerjaan Struktur Bawah dari Proyek Bangunan Gedung Bertingkat Tinggi di Jakarta. Jakrarta, Indonesia: TA No. 1023/FT.01/SKRIP/07/2011. Universitas Indonesia.

Mulyono, T. 2003. Teknologi Beton. : Andi. Yogyakarta

Pranestika dan Daluis, 2015, Analisis Risiko Konstruksi Struktur Atas Dengan Metode Analytical Hierarchy Process (Studi Kasus Pada Proyek Pembangunan Hartono Lifestyle Mall Yogyakarta), Yogyakarta, Jurnal.

Rohmatullah, Fika. 2015. Analisis Perbandingan Biaya dan Waktu Pekerjaan Beton dengan Metode Site Mix dan Ready Mix Jalan Lingkungan BBI Pandak Baturaden. Purwokerto. Universitas Muhammadiyah Purwokerto.

Santosa, Singgih. (2003). Mengatasi Berbagai Masalah dengan SPSS Versi 11.5. Elex Media Komputindo. Jakarta

Saputra, T. D., Dharmahusada, L. E. 2010. Produktivitas Pengecoran Beton Ready-mixed dengan Concrete Pump dan Tower Crane. Surabaya, Indonesia: TA No. 21011734/SIP/2010. Universitas Kristen Petra.

Sudomo. 2015. Analisis Mutu Beton Yang Dihasilkan Oleh Perusahaan-Perusahaan Beton Ready Mix. Malang, Jurnal.

Sutanto, A., Gunawan, T. 2006. Manajemen Risiko Bidang Oprasional pada Ready mixed Concrete. Surabaya, Indonesia: TA NO : 20121482/SIP/2006. Universitas Kristen Petra.




DOI: https://doi.org/10.35327/gara.v13i1.57

Refbacks

  • There are currently no refbacks.


Copyright (c) 2019 GANEC SWARA

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

https://similarplay.com/