ANALISIS IDENTIFIKASI DAN PENILAIAN RISIKO PADA PROYEK PEMBANGUNAN JALAN DI ATAS SUNGAI (STUDI KASUS JALAN DI ATAS SUNGAI MATI KEC. KUTA, KAB. BADUNG)

I GUSTI AGUNG AYU ISTRI LESTARI, KRISNA KURNIARI, I KADEK DWIRA PUTRA

Abstract


The planning of the Altertantif Road Development Project in Kuta District, Badung Regency, Bali Province was carried out to facilitate access to transportation in the area and to overcome traffic congestion at the Jalan Raya Kuta - Jalan Blambangan intersection. The implementation plan of the Road Construction Project over the Mati River, Kuta District, Badung Regency, Bali Province has various risks that may occur. Risk management is needed to minimize the impact and possibility of risks that will occur in the Road Construction project over the Dead River, Kuta District, Badung Regency, Bali Province. The method used in this research is descriptive qualitative method, namely interviews and brainstorming with competent parties and parties involved in the Road Construction Project over the Dead River, Kuta District, Badung Regency, Bali Province with a total of 25 respondents. Each respondent responds to the likelihood of a risk occurring (likelihood) and responds to the impact/influence that occurs due to the risk (consequences), then will get a risk assessment by multiplying the mode value of the frequency/probability of risk occurrence (likelihood) with the mode value of the influence/impact of risk (consequences). In this study, 34 risk identifications were obtained. These risks include 6 (17.65%) unacceptable risks, 21 (61.76%) undesirable risks, 7 (20.59%) acceptable risks, and 0% or no risks classified as negligible

Keywords


Risk, Identification, Assessment, road over the river

Full Text:

PDF

References


Budi, Santoso (2009). Manajemen Proyek, Penerbit: Graha Ilmu, Yogyakarta.

Dimyati & Nurjaman (2014). Manajemen Proyek, Penerbit: Pustaka Setia, Bandung.

Djojosoedarso, S. (2003). Prinsip-Prinsip Manajemen Resiko Dan Asuransi, Edisi. Revisi. Jakarta: Salemba Empat.

Ervianto, W. I. (2002). Manajemen Proyek Konstruksi, Penerbit: Andi, Yogyakarta.

Godfrey, P. S., Sir William, H., & Ltd, P. (1996). Control of Risk A Guide to Systematic Management Of Risk from Construction. Wesminster London: Construction Industry Research and Information Association (CIRIA).

Hanafi, Mamduh M (2006). Manajemen Risiko., Yogyakarta: Sekolah Tinggi Ilmu Manajemen YKPN.

IAI. (2009). Standar Akuntansi Keuangan Entitas Tanpa Akuntabilitas Publik. Jakarta: Dewan Standar Akuntansi Keuagan.

Kuntjojo. (2009). Metodologi Penelitian. Kediri: Universitas Nusantara Pgri

Lestari (2009). Manajemen Risiko Pada Bandara Ngurah Rai Dalam Mengantisipasi Arus Lalu LintasUdara Di Masa Yang Akan Datang. Tesis, Program Pascasarjana Universitas Udayana, Denpasar.

Martha (2019). Manajemen Risiko Terhadap Pelaksanaan Proyek Konstruksi Hotel di Kawasan Sarbagita Vol. 7, No. 1, Hal. 51 – 57.

Morissan, M.A. (2012). Metode Penelitian Survei. Penerbit: Kencana: Jakarta.

Norken, N., Astiti, N. P. M., & Purbawijaya, I B. N. (2015). Analisis Risiko Pelaksanaan Pembangunan Jalan Tol Benoa-Bandara-Nusa Dua. Jurnal Spektran, 3 (2).

Martha (2019). Manajemen Risiko Terhadap Pelaksanaan Proyek Konstruksi Hotel di Kawasan Sarbagita Vol. 7, No. 1, Hal. 51 – 57.

Morissan, M.A. (2012). Metode Penelitian Survei. Penerbit: Kencana: Jakarta.

Norken, N., Astiti, N. P. M., & Purbawijaya, I B. N. (2015). Analisis Risiko Pelaksanaan Pembangunan Jalan Tol Benoa-Bandara-Nusa Dua. Jurnal Spektran, 3 (2).




DOI: https://doi.org/10.35327/gara.v17i2.445

Refbacks

  • There are currently no refbacks.


Copyright (c) 2023 GANEC SWARA

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

https://similarplay.com/