The development of construction technology is currently experiencing rapid progress which is characterized by the presence of various types of modern materials and equipment, especially in the field of construction. With the increasingly rapid technological advancements in the field of construction, the innovations that have been raised are floor plate systems using boundeck, which is another alternative to conventional plates. Therefore, it is necessary to conduct analytical research to determine the efficiency of the use of the boundeck concrete plate method on concrete slab work, when compared to the use of conventional methods, both in terms of cost, time and method of implementation.
The results showed that: (1) The cost of boundeck concrete plate formwork was 51% cheaper than conventional concrete plates; (2) The cost of fixing boundeck concrete plates is 56% cheaper than conventional concrete plates; (3) Casting costs 18% cheaper than conventional concrete plates; (4) Cost of boundeck concrete plate material is 43% cheaper than conventional concrete plates; (5) The cost of the boundeck concrete plate worker wages is 12% cheaper than conventional concrete plates; (6) The cost of renting boundeck concrete plates is 46% cheaper than conventional concrete plates; (7) The duration of implementation of boundeck concrete plates is 32% faster than conventional concrete plates; (8) Recapitulation of the cost of boundeck concrete plates is 41% cheaper than conventional concrete plates; (9) Boundeck concrete plates produce less waste material compared to conventional concrete plates; (10) Procurement of boundeck concrete plate material is more difficult than conventional concrete plates. Based on these ten (10) aspects, the boundeck concrete plate method is more recommended for concrete slab work.Keywords
Full Text:
PDFReferences
Aiman, N. (2014). Studi Perbandingan Penggunaan Teknologi Pelat Beton Konvensional Dan Pelat Beton Bondek Gedung Ball Room Universitas Muhammadiyah Makasar. Makasar
Ervianto, I (2002), Manajemen Proyek Konstruksi, Yogyakarta: Penerbit Andi
Husen, A. (2011). Manajemen Proyek, Yogyakarta : Penerbit Elib Unikom
Ibrahim, B. (2007). Rencana Dan Estimasi Real Of Cost Jilid IV Jakarta : PT. Bumi Askara
Mandani, T. (2010). Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Pasangan Bata. Surakarta : Universitas Sebelas Maret.
Mulyana. D. (2009). Analisis Likuiditas Saham Serta Pengaruhnya Terhadap Harga Saham Pada Perusahaan Yang Berada Pada Indeks LQ45 Di Bursa Efek Indonesia . Jurnal Magister Manajemen Volume 4 halaman 77-96
Nazir, M. (2005). Metode Penelitian. Jakarta: Ghalia Indonesia.
Soeharto, I. (1999). Tata Manajemen Proyek.. Bandung: PT. Gelora Aksara Pratama
Taroreh, H. (2010). Manajemen Konstruksi. Yogyakarta : PT. Ganesha utama
Tatang, M. (2015). Metode Penelitian Sekunder (Analisis Data Sekunder). Diakses dari http://tatangmanguny.wordpress.com. Pada Tanggal 02 Desember 2017, puku 20.00 WITA,
Uji, Andi T. (2015). Perbandingan Biaya Pelaksanaan Pelat Beton Menggunakan Boundeck dan pelat Lantai Konvensional Pada Gedung Graha Suraco, Jurusan Teknik Sipil, Fakultas Teknik, Universitas Hasanuddin, Makassar.
DOI: https://doi.org/10.35327/gara.v16i1.263
Refbacks
- There are currently no refbacks.
Copyright (c) 2022 GANEC SWARA
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.